Project Documentation · Delivery Documents

项目文件 · 交付文档

File delivery capability — not just the steel.

文件交付能力——不只是钢结构。

Document quality across fabrication, FAT, shipping, installation and handover. Packages structured around international EPC / owner-engineer expectations — Bechtel/Fluor/Technip-style document discipline as a reference mindset (not claimed as clients).

覆盖制造、FAT、发运、安装与移交的文件质量。 成套组织对齐国际 EPC / 业主工程师期望——以 Bechtel/Fluor/Technip 式文件纪律为参考思路(不声称上述公司为客户)。

EXAMPLE · SAMPLE DOCUMENT LAYOUTS

Core delivery documents

核心交付文件

Sample images below are EXAMPLE templates — illustrative layout only, not a live project claim.

以下样例图均为 EXAMPLE 模板——仅示意版式,不作在建项目背书。

EXAMPLE EXAMPLE Risk Assessment document template
EXAMPLE

Risk Assessment

风险评估

Hazard identification, residual risk and control measures aligned to the crane package and site interfaces.

危害识别、残余风险与控制措施,对齐起重成套与现场接口。

EXAMPLEHSE
EXAMPLE EXAMPLE Inspection & Test Plan template
EXAMPLE

ITP — Inspection & Test Plan

ITP — 检验与试验计划

Hold / witness points from fabrication through FAT — clear ownership for mill, vendor and client/EPC.

从制造到 FAT 的 Hold/Witness 点——明确工厂、供方与客户/EPC 责任。

EXAMPLEQA / QC
EXAMPLE EXAMPLE Operation Manual template
EXAMPLE

Operation Manual

操作手册

Safe operation, limits, controls and routine checks for operators and site supervisors.

面向操作员与现场主管的安全操作、限制、控制与例行检查。

EXAMPLEManual
EXAMPLE EXAMPLE Installation Instruction Manual template
EXAMPLE

Installation Instruction Manual

安装指导手册

Sequenced install steps, lifting points, alignment and torque / commissioning notes for site crews and local partners.

分步安装、吊点、找正与扭矩/调试说明,服务现场队伍与本地伙伴。

EXAMPLEInstall
EXAMPLE EXAMPLE Service / Maintenance Manual template
EXAMPLE

Service / Maintenance Manual

服务 / 维护手册

Preventive schedules, lubrication, inspection intervals and troubleshooting guidance for long-term ownership.

预防性计划、润滑、检查周期与排障指引,服务长期运维。

EXAMPLEMaintenance
EXAMPLE EXAMPLE Spare Parts Manual template
EXAMPLE

Spare Parts Manual

备件手册

Illustrated parts lists with recommended critical / consumable spares for first-year stock.

图示备件清单,含首年建议关键件与易耗件。

EXAMPLESpares

Document catalogue

文件目录

Also delivered in a typical package

典型成套中还可包含

Scope confirmed per enquiry — not every item ships on every order.

范围按询盘确认——并非每单默认全部发出。

  • Method Statements
  • 施工方案 / Method Statements
  • WPS / PQR summaries
  • WPS / PQR 摘要
  • NDT reports index
  • NDT 报告索引
  • Material Test Certificates register
  • 材质证明(MTC)台账
  • Dimensional / GA as-built
  • 尺寸 / GA 竣工图
  • FAT procedure & report
  • FAT 程序与报告
  • Packing list & shipping docs
  • 装箱单与发运文件
  • Training records
  • 培训记录
  • As-built dossier / MDR (Manufacturer Data Record) index
  • 竣工资料夹 / MDR(制造商数据记录)索引

Multilingual packs

多语言成套

EN primary — more languages on request

英文为主——更多语言可按需提供

English is the primary delivery language. Simplified Chinese (ZH) is routinely available. Arabic (AR), Spanish (ES), Portuguese (PT) and Vietnamese (VI) can be arranged on request for manuals and key HSE documents — capability, not a default that every language ships with every order.

英文为主要交付语言;简体中文(ZH)可常规提供。 阿拉伯语(AR)、西班牙语(ES)、葡萄牙语(PT)、越南语(VI)可按需安排于手册与关键 HSE 文件——这是能力说明,并非每单默认全语种出货。

EN Primary ZH Routine AR On request ES On request PT On request VI On request

Quality process

质量流程

Controlled document lifecycle

受控文件生命周期

  1. 01 Spec clarification 规范澄清
  2. 02 Document list (MDL) 文件清单(MDL)
  3. 03 Draft 草稿
  4. 04 Client / EPC review 客户 / EPC 评审
  5. 05 Controlled release 受控发放
  6. 06 As-built closeout 竣工关闭

Need a sample document list or MDL template?

需要样例文件清单或 MDL 模板?

Tell us your project code preference and document language — we share a sample MDL and example layouts for review.

告知项目规范偏好与文件语言——我们提供样例 MDL 与示例版式供评审。

Request sample document list 索取样例文件清单